• SCHEDULED POWER INTERRUPTION SA SETYEMBRE 24 KAG 28, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-construct sang Double Circuit line halin sa Poblacion, Banate pakadto sa Carmelo, Banate. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang BANATE amo ang masunod: PETSA , ORAS KAG APEKTADO NGA LUGAR SETYEMBRE 24,… Read more

  • ILECO III POWER ADVISORY (Update as of 9:20 p.m.)

    What: UNSCHEDULED POWER INTERRUPTION Date: September 16, 2022 (Friday) Time of interruption: 6:53 PM Time of restoration: 9:10 PM Affected areas: ANILAO, BANATE, BAROTAC VIEJO AND SAN RAFAEL Cause: Loose connection of 69kv disconnect switch of Natividad Substation Thank you for bearing with us. We apologize for the inconvenience. For your information. Read more

  • Update on the ongoing unscheduled power interruption in Natividad Area Coverage as of 8:00 p.m.

    Ongoing repair of the 69kv Disconnect Switch of Natividad Substation is being conducted by our Technical Team. Time of power restoration is not yet determined. We apologize for the inconvenience. For your information, thank you. Read more

  • NOTICE TO THE PUBLIC

    Pahibalo sa mga katapo-konsumidores nga ang DISYEMBRE 18, 2023 (LUNES), ang gin-deklara nga SPECIAL PUBLIC HOLIDAY sa ILOILO CITY kag ILOILO PROVINCE, para sa pag-obserba sang “GRACIANO LOPEZ JAENA” base sa Proclamation No. 319 S. 2023. Bangud sini, SARADO ang ILECO III Main Office kaupod ang Area Office (Sara, Natividad) apang BUKAS naman ang Pani-an… Read more

  • LIFELINE RATE DISCOUNT

    Read more

  • 12 DAYS TO GO BEFORE CHRISTMAS!

    Read more

  • ILECO III ENERGY SAVING TIPS

    1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro… Read more

  • ITB 2404, S. 2024

    Refurbishment of Roofing, Glass Counters and Repainting of Sara Area Office. Read more

  • ITB 2403, S. 2024

    Procurement and Supply of Six (6) Units Service Vehicle for Maintenance Use in Area Offices. Read more

  • ITB 2402, S. 2024

    Procurement of Materials for Maintenance, Rehabilitation, Revamp of Lines and Capital Expenditures Read more