• MAY SCHEDULED PREVENTIVE MAINTENANCE ANG NGCP SA NOBYEMBRE 11, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 69 kV Sara-Estancia Section Line sa NOBYEMBRE 11, 2023 (SABADO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: 5:00 AM- 5:30 AM (tunga sa oras ang kalawigon)KAG5:00 PM- 6:00 Read more

  • NGCP UNSCHEDULED POWER INTERRUPTION (OCTOBER 27, 2023)

    Date: October 27, 2023 (Friday)Time of interruption: 12:12 NNTime of restoration: 12:48 NN Affected areas: Banate and Natividad Substation Municipality of Anilao, Banate, Barotac Viejo and San Rafael Cause of interruption: (ILanding) Tripping of Panay-Negros Submarine Cable due to low voltage We apologize for the inconvenience. For your information.  Read more

  • UNSCHEDULED POWER INTERRUPTION (OCTOBER 27, 2023)

    Date: October 27, 2023 (Friday) Time of interruption: 9:42 AM Time of restoration: 10:01 AM Affected areas: Sara Feeder 2 Cause of interruption: Replaced damaged cut-out assembly We apologize for the inconvenience. For your information. Read more

  • NOTICE TO THE PUBLIC

    Pahibalo sa mga katapo-konsumidores nga ang DISYEMBRE 18, 2023 (LUNES), ang gin-deklara nga SPECIAL PUBLIC HOLIDAY sa ILOILO CITY kag ILOILO PROVINCE, para sa pag-obserba sang “GRACIANO LOPEZ JAENA” base sa Proclamation No. 319 S. 2023. Bangud sini, SARADO ang ILECO III Main Office kaupod ang Area Office (Sara, Natividad) apang BUKAS naman ang Pani-an Read more

  • LIFELINE RATE DISCOUNT

    Read more

  • 12 DAYS TO GO BEFORE CHRISTMAS!

    Read more

  • ILECO III ENERGY SAVING TIPS

    1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more