
POWER RATES
POWER ADVISORIES
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 – Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting Read more
NEWS AND UPDATES
Last April 3, 2025, the SAO BAPA Area Assembly was successfully held at ILECO III Gymnasium, Brgy. Preciosa, Sara. The assembly was graced by Hon. Raul “Boboy” C. Tupas, Representative, 5th District of Iloilo and Hon. Binky April M. Tupas, Board Member, 5th District of Iloilo as the Guest Speakers who shared valuable insights with Read more
APRIL 12, 2025 (SATURDAY), 9:00 AM • ILECO III Gymnasium, Brgy. Preciosa, Sara, Iloilo • Balasan Civic Center, Brgy. Poblacion Sur, Balasan, Iloilo • Barotac Viejo Municipal Gymnasium, Brgy. Poblacion, Barotac Viejo, Iloilo “Beyond Power: Electric Cooperatives Empowering Communities, Changing Lives” Read more
APRIL 12, 2025 (SATURDAY), 9:00 AM • ILECO III Gymnasium, Brgy. Preciosa, Sara, Iloilo • Balasan Civic Center, Brgy. Poblacion Sur, Balasan, Iloilo • Barotac Viejo Municipal Gymnasium, Brgy. Poblacion, Barotac Viejo, Iloilo “Beyond Power: Electric Cooperatives Empowering Communities, Changing Lives” Read more
BIDS AND NOTICES
Rehabilitation and Improvement of Pani-an Area Office Read more
Procurement of Materials for Maintenance, Rehabilitation, Revamp of Lines and Capital Expenditure Projects Read more
Procurement of Materials for Maintenance, Rehabilitation, Revamp of Lines and Capital Expenditure Projects Read more