• SCHEDULED POWER INTERRUPTION SA BANWA SANG CONCEPCION SA HUNYO 26, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa HUNYO 26, 2024 (MIYERKULES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-convert sang linya. Ang lugar nga apektado sang sini nga power interruption sa banwa sang CONCEPCION amo ang: • Proper, Batiti (portion) • Purok Mabini, Batiti Madamo Read more

  • EMERGENCY POWER INTERRUPTION

    Date: June 19, 2024 (Wednesday) Time of interruption: 12:00 NN Estimated time of restoration: 1:00 PM Duration: 1 hour Affected areas: Feeder 1 of Ajuy Substation (portion of Concepcion and portion of Ajuy) Activity: Pull-out of streetlight in Puente Bunglas, Ajuy, Iloilo For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG ESTANCIA, BATAD, BALASAN, KAG CARLES SA HUNYO 25, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa HUNYO 25, 2024 (MARTES), 4:30 AM- 6:30 PM (14 ka oras ang kalawigon) para sa pag-energize sang Balasan Substation, pull-out sang power fuse kag disconnect switch, pag-ilis sang mga cross-arm, steel pins kag pole top pins, pag-kuha sang guba nga poste kag Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa Read more

  • NOTICE TO THE PUBLIC

    Ginapahibalo sa mga katapo-kunsumidores sang aton Kooperatiba nga nag-trip/shut down ang power plant sang Panay Energy Development Corporation (PEDC) Unit 3. Bangud sini, kulang ang supply sang kuryente sa isla sang Panay nga posible magresulta sa pag-implementar sang MANUAL LOAD DROPPING (MLD) base sa advice sang National Grid Corporation of the Philippines (NGCP). Sa sini Read more

  • LOOK: ILECO III DONATED STAND FAN AND BOND PAPERS TO DEL PILAR ELEMENTARY SCHOOL

    Thru the efforts of Dir. Villa B. Gumban, Board of Director, ILECO III donated one (1) stand fan and four (4) reams of bond papers to Del PIlar Elementary School in Barotac Viejo, Iloilo on January 18, 2024 (Thursday). We from ILECO III will serve our MCOs beyond electricity. Read more

  • FIRE SAFETY TIP

    Know how to use a fire extinguisher. Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more