
POWER RATES
POWER ADVISORIES
“Visayas grid status, 29 April 2023: At 8:54 AM, NGCP monitored a disturbance. Multiple power plants in Panay disengaged from the transmission system. Parts of the franchise areas of AKELCO , CAPELCO, ANTECO, MORE Power, ILECO I, ILECO II, and ILECO III lost power. NGCP is investigating the root cause of the system disturbance and Read more
Ang aton mga substations nga na energize ang nag-off line sa liwat subong alas 9:08 a.m. bangud sang pag-tripping sang planta sang PEDC nga nagdulot sang unstable nga supply sang kuryente sa bug-os nga Panay power grid. Sara Substation- De-Energized Ajuy Substation – De-Energized Banate Substation -De-Energized Balasan Substation -De-Energized Daan Banwa Substation – Not Read more
Nag abiso ang PEDC nga nagtripped and ila nga unit 1 & 3 kag yara na sa under investigation ang status sang ila nga mga planta alas 2:39 kagina sang kaagahon. Nag paguwa naman sa liwat ang PEDC sang update alas 6:00 kagina sang aga nga nasynchronize na nila liwat ang Unit 1 nila ng Read more
NEWS AND UPDATES
ILECO III employees appeared during the ABC Meeting in Batad, Iloilo held at Liga Office on February 05, 2024 (Monday). The said appearance intends to update the Punong Barangays of the said municipality of the programs of ILECO III pertaining to electrification and at the same time encourage them to be participative in all the Read more
Use LED lights. Read more
Naga-padayon ang operasyon sang ILECO III nga “OPERATION BAKLAS” subong nga adlaw, Pebrero 1, 2024 (Huwebes). Ginpangkuha sang ILECO III ang tanan nga mga unauthorized cable wires sang mga unlicensed Telco/Internet Providers sa Barangay Dolores, Balasan nga naga-attach sa poste sang ILECO III nga wala sang pahanugot halin sa aton kooperatiba. Ang ini nga mga Read more
ILECO III personnel successfully conducted on-site Pre-Membership Seminar (PMS) to 200 recipients of 2023 Barangay Line Enhancement Program (BLEP) in Barangay Dungon and Maliog-liog, Concepcion, Iloilo, January 31, 2024 (Wednesday). The National Electrification Administration (NEA) appropriated budget to electrify five (5) island barangays with 1,477 households within ILECO III area coverage for the year. This Read more
BIDS AND NOTICES
Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Five (5) Barangays (Brgy. Barangcalan, Brgy. Bito-on, Brgy. Talingting, Brgy. Tinigban, and Brgy. Punta Batuanan) in Calagnaan Island, Carles, Iloilo (Turn Key) Read more
Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials from Brgy. Poblacion to Brgy. Daculan, Estancia and Brgy. Manlot, Manlot Island, Carles, Iloilo(Turn Key) Read more
Invitation to Bid for the Design, Supply, Delivery, Installation, Testing and Commissioning of Three-Phase Submarine Line Cable from Brgy. Daculan, Estancia to Brgy. Manlot, Carles, from Brgy. Manlot to Brgy. Talingting, Carles and from Brgy. Punta Batuanan to Brgy. San Fernando, Carles, Iloilo (Turn Key) Read more