
POWER RATES
POWER ADVISORIES
ari ang eksplinasyon nahangungod sa pagpatigayon sang MLD sang aton nga Coverage Area. INDI ini kontrolado sang ILECO III bangud kulang ang supply sang kuryente nga ginahatag sang generation apang ang demand nga ginakinahanglan sang aton miyembro-konsumidor ang masobra sa available nga capasidad sang planta. Madamo gid nga salamat sa inyo nga paghangop. Read more
“Visayas grid status, 29 April 2023: At 8:54 AM, NGCP monitored a disturbance. Multiple power plants in Panay disengaged from the transmission system. Parts of the franchise areas of AKELCO , CAPELCO, ANTECO, MORE Power, ILECO I, ILECO II, and ILECO III lost power. NGCP is investigating the root cause of the system disturbance and Read more
Ang aton mga substations nga na energize ang nag-off line sa liwat subong alas 9:08 a.m. bangud sang pag-tripping sang planta sang PEDC nga nagdulot sang unstable nga supply sang kuryente sa bug-os nga Panay power grid. Sara Substation- De-Energized Ajuy Substation – De-Energized Banate Substation -De-Energized Balasan Substation -De-Energized Daan Banwa Substation – Not Read more
NEWS AND UPDATES
In its commitment to enhance the empowerment of Member-Consumer-Owners, ILECO III successfully held its 33rd Annual General Membership Assembly (AGMA) on Saturday, April 12, 2025, across three strategic locations: • For the Sara Area Coverage (Sara, Lemery, Ajuy, San Dionisio, and Concepcion): ILECO III Gymnasium, Brgy. Preciosa, Sara • For the Pani-an Area Coverage (Batad, Read more
APRIL 1, 2025 – EID’L FITR APRIL 9, 2025 – ARAW NG KAGITINGAN APRIL 17, 2025 – MAUNDY THURSDAY APRIL 18, 2025 – GOOD FRIDAY MAIN OFFICE AND AREA OFFICES – CLOSED ASSIGNED MAINTENANCE CREW ARE AVAILABLE AT AREA OFFICES TO ADDRESS YOUR CONCERNS/ COMPLAINTS. REGULAR OFFICE WILL RESUME ON APRIL 21, 2025 (MONDAY) MADAMO Read more
For your information. Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more