
POWER RATES
POWER ADVISORIES
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa HUNYO 27, 2024 (HUWEBES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-convert sang open secondary line to single phase line kag pag-construct sang tapping pole. Ang lugar nga apektado sang sini nga power interruption sa banwa sang AJUY Read more
What: NGCP UNSCHEDULED POWER INTERRUPTION Time of power interruption: 7:38 p.m. Time of power restoration: 7:53 p.m. Affected areas: Municipalities of Anilao, Banate, Barotac Viejo and San Rafael Our Technical Team is currently in coordination with the National Grid Corporation of the Philippines (NGCP) for the cause of the said power interruption. Thank you for Read more
Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED POWER INTERRUPTION ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila AJUY, SARA, BALASAN kag ESTANCIA 69 kV Line sa HUNYO 25, 2024 (MARTES). Ang oras kag apektado nga lugar sang sini nga power interruption amo ang masunod: PETSA KAG ORAS APEKTADO NGA LUGAR 4:30 Read more
NEWS AND UPDATES
Pahibalo sa mga katapo-kunsomidor nga may patigayunon nga Pinili-ay sang Hunta Direktiba “District Election” sa District II (Sara and Lemery) sa Marso 23, 2024 (Sabado). Maga-sugod ang pagboto halin alas 8:00 sang aga sa mga masunod nga mga voting centers: Sara : Sara Central Elementary School Address: Brgy. Poblacion, Sara Lemery: Jose Almiñana Memorial Elementary Read more
Unopposed for Board of Director, Mr. Harry G. Tupas has been proclaimed as the new Board of Director of the said District. He will take oath on 27th of April 2024 at the Annual General Membership Assembly (AGMA). Mr. Tupas will sit as the newly elected Board of Director and will be replacing Dir. Villa Read more
For your information. Read more
Ang tanan nga rate sang isa ka Electric Cooperative (EC) gina-approve sang Energy Regulatory Commission (ERC) bag-o ini paga-sukton sa mga konsumidor. Ano bala ang ka-undan sang aton mga power bill kag diin ini nagakadto? GENERATION SYSTEM CHARGE Ini ang ginasukot sang mga Electric Cooperatives para bayaran ang ginakuha nga kuryente halin sa mga power Read more
BIDS AND NOTICES
Design and Integration of ILECO III Mobile Application Read more