
POWER RATES
POWER ADVISORIES
Date: August 25, 2024 (Sunday) Time of interruption: Feeder 1 – 4:40 PM Feeders 2, 3 and 4 – 6:07 PM Time of restoration: 6:49 PM Affected area/s: All coverage of Sara Substation Cause of Interruption: Replacement of burnt by-pass connection We do apologize for the inconvenience that it caused. Thank you for your understanding. Read more
Date: August 25, 2024 (Sunday) Time of interruption: Feeder 1 – 4:40 PM Feeders 2, 3 and 4 – 6:07 PM Time of restoration: Not Yet Determined Affected area/s: All coverage of Sara Substation Cause of Interruption: Replacement of burnt by-pass connection For your information. Read more
Date: August 25, 2024 (Sunday) Time of interruption: 4:40 PM Time of restoration: F2, F3 and F4 – 4:51 PM Feeder 1 – Not Yet Determined Affected area: Portion of Sara All Barangays of San Dionisio Cause of Interruption: Animal Contact at Sara Substation which resulted in a burnt by-pass connection. For your information. Read more
NEWS AND UPDATES
As part of the Cooperative’s continued program to strengthen the employees spiritual growth, ILECO III conducted a Recollection Activity with a theme “Sowing and Reaping God’s Graces” last March 18, 2024 at NGB Site, Brgy. Tuble San Dionisio Iloilo. Rev. Father Rafael Luis Clavel from the Parish of Culasi, Ajuy was the resource speaker. This Read more
This meeting was conducted to inform the members of the status of the BAPA operation and update them of the programs and activities of the Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). For your information. Read more
This meeting was conducted to inform the members of the status of the BAPA operation and update them of the programs and activities of the Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). For your information. Read more
GENERATION – Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION – Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente Read more
BIDS AND NOTICES