
POWER RATES
POWER ADVISORIES
Pahibalo sa mga katapo-konsumidores nga may EMERGENCY PLANT SHUTDOWN ang NATIONAL POWER CORPORATION (NPC)- SPUG sa HULYO 10, 2021 (DOMINGO) 1:00 PM- 5:00 PM (apat ka oras ang kalawigon) para sa pag-install sang bag-o nga FDS connection sang transformer. Ang apektado nga lugar sa ISLA GIGANTES, CARLES amo ang masunod: • Brgy. Asluman• Brgy. Gabi•… Read more
Date: July 08, 2022 Time of interruption: 5:00 AM Time of restoration: 5:40 AM Affected areas: San Florentino, San Rafael and Rizal, Barotac Viejo Activity: Replaced busted fuse link due to animal contact We apologize for the inconvenience. For your information. Read more
Date: July 08, 2022 (Friday) Time of interruption: 9:07 AMTime of restoration: 9:21 AM Affected areas: Batad (All barangays) and Estancia (portion) Activity: Replacement of damaged pin insulator and suspension insulator in Calapdan, Estancia We apologize for the inconvenience. For your information. Read more
NEWS AND UPDATES
As part of the Cooperative’s continued program to strengthen the employees spiritual growth, ILECO III conducted a Recollection Activity with a theme “Sowing and Reaping God’s Graces” last March 18, 2024 at NGB Site, Brgy. Tuble San Dionisio Iloilo. Rev. Father Rafael Luis Clavel from the Parish of Culasi, Ajuy was the resource speaker. This… Read more
This meeting was conducted to inform the members of the status of the BAPA operation and update them of the programs and activities of the Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). For your information. Read more
This meeting was conducted to inform the members of the status of the BAPA operation and update them of the programs and activities of the Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). For your information. Read more
GENERATION – Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION – Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente… Read more
BIDS AND NOTICES