
POWER RATES
POWER ADVISORIES
Date: September 28, 2023 (Thursday) Time of interruption: 8:00 AM Estimated time of restoration: 9:42 AM Affected Area/s: Portion of NHA Village, Calapdan, Estancia Activity: Replaced damaged distribution transformer (25kVA) We apologize for the inconvenience. For your information. Read more
Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREMENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50 MVA Transformer No. 1 sa Concepcion Substation sa OKTUBRE 01, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: OKTUBRE 01, 2023 (DOMINGO)5:00 AM- 7:00 AM (2 Read more
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang CARLES amo ang masunod: OKTUBRE 02, 2023 (LUNES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon) • Binuluangan• Tabugon OKTUBRE 03, 2023 (MARTES)8:00 Read more
NEWS AND UPDATES
As part of the Cooperative’s continued program to strengthen the employees spiritual growth, ILECO III conducted a Recollection Activity with a theme “Sowing and Reaping God’s Graces” last March 18, 2024 at NGB Site, Brgy. Tuble San Dionisio Iloilo. Rev. Father Rafael Luis Clavel from the Parish of Culasi, Ajuy was the resource speaker. This Read more
This meeting was conducted to inform the members of the status of the BAPA operation and update them of the programs and activities of the Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). For your information. Read more
This meeting was conducted to inform the members of the status of the BAPA operation and update them of the programs and activities of the Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). For your information. Read more
GENERATION – Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION – Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente Read more
BIDS AND NOTICES
Design and Integration of ILECO III Mobile Application Read more