POWER RATES
POWER ADVISORIES
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 – Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting Read more
NEWS AND UPDATES
As part of the Cooperative’s continued program to strengthen the employees spiritual growth, ILECO III conducted a Recollection Activity with a theme “Sowing and Reaping God’s Graces” last March 18, 2024 at NGB Site, Brgy. Tuble San Dionisio Iloilo. Rev. Father Rafael Luis Clavel from the Parish of Culasi, Ajuy was the resource speaker. This Read more
This meeting was conducted to inform the members of the status of the BAPA operation and update them of the programs and activities of the Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). For your information. Read more
This meeting was conducted to inform the members of the status of the BAPA operation and update them of the programs and activities of the Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). For your information. Read more
GENERATION – Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION – Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente Read more
BIDS AND NOTICES
15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more
Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more
Procurement of Boom Truck Read more