
POWER RATES
POWER ADVISORIES
Pahibalo sa mga katapo-konsumidores nga KANSELADO ukon INDI MADAYON ang power interruption sa ENERO 27, 2024 (SABADO), 6:00 AM- 4:00 PM (10 ka oras ang kalawigon) para sa pag-clearing sang linya kag pag-ilis sang mga poste kag cross-arms. Ang lugar nga apektado sang sini nga power interruption amo ang masunod:• TANAN NGA BARANGAY SA ANILAO• Read more
Date: January 24, 2024 Time of interruption: 10:45 AM Time of power restoration: 11:23 AM Affected areas: NHA Village Site 1, Nalumsan, Carles, Iloilo Activity: Repaired transformer supply and jumper loose connection For your information. Read more
Date: January 24, 2024 Time of interruption: 6:43 AM Time of power restoration: 8:46 AM Affected areas: Bolo, Tupaz, Cabuguana, Bancal (portion), Poblacion, Carles, Iloilo Activity: Replaced damage assembly fuse cut-out in Balantian, Balasan For your information. Read more
NEWS AND UPDATES
As part of the Cooperative’s continued program to strengthen the employees spiritual growth, ILECO III conducted a Recollection Activity with a theme “Sowing and Reaping God’s Graces” last March 18, 2024 at NGB Site, Brgy. Tuble San Dionisio Iloilo. Rev. Father Rafael Luis Clavel from the Parish of Culasi, Ajuy was the resource speaker. This Read more
This meeting was conducted to inform the members of the status of the BAPA operation and update them of the programs and activities of the Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). For your information. Read more
This meeting was conducted to inform the members of the status of the BAPA operation and update them of the programs and activities of the Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). For your information. Read more
GENERATION – Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION – Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente Read more
BIDS AND NOTICES
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Poles Read more