
POWER RATES
POWER ADVISORIES
All ILECO III Feeders were energized. The reason of power interruption was the over voltage of transmission line of NGCP caused by tripping of power generation plant on April 27, 2023 at around 1:53 PM affecting the entire Panay Island. We apologize for the inconvenience. For your information. Read more
ILECO III Technical Team is still coordinating with National Grid Corporation of the Philippines (NGCP) and power suppliers for total power restoration of franchise coverage. We apologize for the inconvenience. For your information. Read more
Date: April 27, 2023 Time of interruption: 9:47 PM Affected areas: Feeder 1-Sara Substation TIME OF POWER RESTORATION: NOT YET DETERMINED For your information. Read more
NEWS AND UPDATES
Ang tanan nga rate sang isa ka Electric Cooperative (EC) gina-approve sang Energy Regulatory Commission (ERC) bag-o ini paga-sukton sa mga konsumidor. Ano bala ang ka-undan sang aton mga power bill kag diin ini nagakadto? GENERATION SYSTEM CHARGE Ini ang ginasukot sang mga Electric Cooperatives para bayaran ang ginakuha nga kuryente halin sa mga power Read more
Furthermore, ILECO III organized a BAPA Capacity Building Seminar to strengthen and educate our MCOs on the significance of teamwork and cooperation for the success of their association. The seminar topics were presented by Ms. Rodelin T. Malones. ILECO III remains committed to empower, educate, and inform our Member-Consumer-Owners through initiatives and activities like this. Read more
BIDS AND NOTICES
15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more
Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more
Procurement of Boom Truck Read more