POWER RATES
POWER ADVISORIES
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 – Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting Read more
NEWS AND UPDATES
Ang tanan nga rate sang isa ka Electric Cooperative (EC) gina-approve sang Energy Regulatory Commission (ERC) bag-o ini paga-sukton sa mga konsumidor. Ano bala ang ka-undan sang aton mga power bill kag diin ini nagakadto? GENERATION SYSTEM CHARGE Ini ang ginasukot sang mga Electric Cooperatives para bayaran ang ginakuha nga kuryente halin sa mga power Read more
Furthermore, ILECO III organized a BAPA Capacity Building Seminar to strengthen and educate our MCOs on the significance of teamwork and cooperation for the success of their association. The seminar topics were presented by Ms. Rodelin T. Malones. ILECO III remains committed to empower, educate, and inform our Member-Consumer-Owners through initiatives and activities like this. Read more
BIDS AND NOTICES
Procurement of 4X4 Pick Up Vehicle for Area Offices and Utility Van for Main Office Read more
Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loan, and Maintenance Use Read more