• SCHEDULED PREVENTIVE MAINTENANCE SANG NGCP SA ENERO 15, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga LOAD TRANSFER kag SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50 MVA TR1 sa Concepcion Substation sa ENERO 15, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod:4:00 AM- 5:00 AM (1 ka oras ang… Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 10, 2023)

    Date: January 10, 2023 Time.of interruption: 8:09 PM Time of restoration: 8:43 PM Affected area: St. Therese Village, Dayhagan, Carles, Iloilo Activity: Repaired secondary neutral bushing loose connection of transformer We apologize for the inconvenience. For your information. Read more

  • REHAB OF KWHR METERS IN BRGY. MERCED, BANATE

    ILECO III conducted rehab of 11 kwhr meters due to burned source side in Brgy. Merced, Banate, Iloilo today, January 10, 2023. For your information. Read more

  • NOTICE TO THE PUBLIC Press Release

    Pahibalo sa mga katapo-konsumidor nga may ara sang issuance ang National Grid Corporation of the Philippines o NGCP nga may Yellow Alert sa Visayas Grid bangud sa dose (12) ka mga planta ang nag forced shutdown sa Luzon Grid kag limitado ang supply sang kuryente sa lima (5) ka mga available nga mga planta. Basi… Read more

  • REQUIREMENTS FOR CHANGE OF NAME

    DECEASED MEMBER CONSUMER 1. For Spouse Applicants • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III signed by Punong Barangay • Marriage Contract • Proof of Ownership – (e.g. deed of sale, affidavit of heirship) (if available) 2. For Legal Heirs • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III •… Read more

  • SCHEDULE OF DUE DATES AND DISCONNECTION FOR THE MONTH OF APRIL 2024

    For your information. Read more

  • GRID ALERT STATUS FROM NGCP

    𝐆𝐑𝐈𝐃 𝐀𝐋𝐄𝐑𝐓 𝐒𝐓𝐀𝐓𝐔𝐒: Visayas grid status, 16 April 2024 𝐘𝐞𝐥𝐥𝐨𝐰 𝐚𝐥𝐞𝐫𝐭 2:00PM-4:00PM 6:00PM-7:00PM Available Capacity – 2,742MW Peak Demand – 2,440MW Twelve (12) power plants are on forced outage, while five (5) others are running on derated capacities, for a total of 676.5MW unavailable to the grid. A yellow alert is issued when the operating… Read more