
POWER RATES
POWER ADVISORIES
Date: May 02, 2023 Time of interruption: 12:56 PM Time of restoration: 2:37 PM Affected area: Sitio Tuong, Pantalan, Carles, Iloilo Activity: Repaired secondary neutral jumper cut-off We apologize for the inconvenience. For your information. Read more
NAHANUNGOD SA NAGA LAPTA NGA MESSAGE SA ATON NGA FB MESSENGER Read more
Sa subong nga ti-on ang TANAN nga feeders sang mga masunod nga substations ang aton na nga na-energized: Sara Substation Ajuy Substation Banate Substation Balasan Substation Daan Banwa Substation Barotac Viejo Substation Ang aton nga mga feeders ang 100% energized na sa kabilugan nga coverage sang ILECO III. Sa liwat, ang mga nag-kalatabo nga shutdown Read more
NEWS AND UPDATES
Pahibalo sa mga katapo-konsumidor nga may ara sang issuance ang National Grid Corporation of the Philippines o NGCP nga may Yellow Alert sa Visayas Grid bangud sa dose (12) ka mga planta ang nag forced shutdown sa Luzon Grid kag limitado ang supply sang kuryente sa lima (5) ka mga available nga mga planta. Basi Read more
DECEASED MEMBER CONSUMER 1. For Spouse Applicants • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III signed by Punong Barangay • Marriage Contract • Proof of Ownership – (e.g. deed of sale, affidavit of heirship) (if available) 2. For Legal Heirs • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III • Read more
For your information. Read more
𝐆𝐑𝐈𝐃 𝐀𝐋𝐄𝐑𝐓 𝐒𝐓𝐀𝐓𝐔𝐒: Visayas grid status, 16 April 2024 𝐘𝐞𝐥𝐥𝐨𝐰 𝐚𝐥𝐞𝐫𝐭 2:00PM-4:00PM 6:00PM-7:00PM Available Capacity – 2,742MW Peak Demand – 2,440MW Twelve (12) power plants are on forced outage, while five (5) others are running on derated capacities, for a total of 676.5MW unavailable to the grid. A yellow alert is issued when the operating Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more