
POWER RATES
POWER ADVISORIES
Ang oras kag apektado nga lugar sang sini nga power interruption amo ang masunod: HUNYO 01, 2024 (SABADO) 4:00 PM- 5:00 PM (1 ka oras ang kalawigon) • SARA • LEMERY • AJUY • CONCEPCION • SAN DIONISIO • ESTANCIA • BATAD • CARLES • BALASAN Ang NGCP ang system operator sang Transmission Line nga Read more
Date: May 29, 2024 (Wednesday) Time of interruption: 9:00 AM Time of restoration: 10:30 AM Affected area: Villa Pani-an, Estancia, Iloilo Activities: Replaced damage transformer and conducted load splitting For your information. Read more
Date: May 29, 2024 Time of interruption: 9:21 AM Estimated time of restoration: 2:00 PM Activity: On-going replacement of two (2) rotten poles and rehabilitation of khwr meters Affected area: Brgy. Moto, San Dionisio, Iloilo For your information. Read more
NEWS AND UPDATES
For everyone’s information. Update on Visayas grid status, 17 April 2024: Red alert 5:00PM-9:00PM Yellow alert 9:00PM-10:00PM Red alert status is raised in the Visayas grid due to the reduced output of MVIP brought about by the tripping of GNPK 2 (138MW) & SMCPC U2 (135MW). Manual load dropping or rotational power interruptions may be Read more
Ang layi wala nagapahanugot sang masunod: FLYING CONNECTION – Pag-angot sang linya sang kuryente sa iban nga balay nga may metro ukon kuntador. TAMPERING – Pagkuti/pagbutang sang ano man nga mga bagay sa metro ukon kuntador. ILLEGAL/ DIRECT TAPPING – Pagtakod sang serbisyo sang kuryente nga wala naga-agi sa kuntador. Mga penalidad kung maglapas sa Read more
ZOOM PLATFORM OPTION 1 – ONLINE (Virtual Attendance): 1. Ang mga rehistrado nga miyembro-kunsumidor lamang ang pwede makatambong sang aton 32nd AGMA. 2. I-scan lng ang QR code nga makita sa idalom ukon i-click ang registration link nga makita sa official FB page account sang ILECO III. 3. Mag-download sang ZOOM application sa inyo nga Read more
BIDS AND NOTICES
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Poles Read more