
POWER RATES
POWER ADVISORIES
Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Dingle-Natividad 69kV Line sa HUNYO 08, 2022 (MIYERKULES), 1:00 AM- 6:00 AM (5 ka oras ang kalawigon). Ang apektado nga lugar sang power interruption amo ang masunod: • ANILAO• BANATE• BAROTAC VIEJO• SAN RAFAEL… Read more
Date: June 02, 2022 Time of interruption: 3:49 PM Time of restoration: 3:59 PM Affected areas: General Luna, Barotac Viejo, Iloilo Activity: Inspection and replaced busted fuse link We apologize for the inconvenience. For your information. Read more
Date: June 02, 2022 Time of interruption: 11:51 AM Time of restoration: 01:10 PM Affected areas: San Lucas, Barotac Viejo, Iloilo Activity: Inspection and replaced busted fuse link We apologize for the inconvenience. For your information. Read more
NEWS AND UPDATES
For your information. Read more
This meeting was conducted as first step to apply for house wiring connection and membership in the cooperative. This activity is made possible with the support of ILECO III Officers and Management headed by our General Manager Atty. James G. Balsomo II. For your information. Read more
This meeting was conducted to inform the members of the status of the BAPA operation and update them of the programs and activities of the Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). This activity is made possible with the support of ILECO III Officers and… Read more
This meeting was conducted to inform the members of the status of the BAPA operation and update them of the programs and activities of the Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). This activity is made possible with the support of ILECO III Officers and… Read more
BIDS AND NOTICES
Design and Integration of ILECO III Mobile Application Read more