
POWER RATES
POWER ADVISORIES
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa SETYEMBRE 14, 2025 (DOMINGO), 5:00 AM- 6:00 PM (13 ka oras ang kalawigon) para sa pag-install sang bag-o nga feeder line, pag-ilis sang steel pins, patigayunon nga Preventive Maintenance sa Sara Substation kag pag-clearing sang linya. Ang mga lugar nga apektado sang Read more
Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50MVA Transformer No. 2 sa Dingle Substation Line sa SETYEMBRE 13, 2025 (SABADO). Ang oras kag apektado nga lugar sang sini nga power interruption amo ang masunod: SETYEMBRE 13, 2025 (SABADO) 6:00 AM- 6:00 Read more
Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang ILECO III sa SETYEMBRE 05, 2025 (BIYERNES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-relocate kag pag-clearing sang linya Ang mga lugar nga apektado sang sini nga power interruption sa banwa sang BALASAN amo ang mga masunod: Madamo gid nga salamat Read more
NEWS AND UPDATES
For your information. Read more
The IEC also aims to empower the member-consumer-owners (MCOs) through dissemination of important information pertaining to ILECO III’s operation. The energization of far-flung areas especially those in off-grid is part of ILECO III’s fulfillment of its mandate of total rural electrification. For your information. Read more
For the people of Tagubanhan Island, a dream was made into reality with the electrification of the said off-grid island. On June 6, 2024 (Thursday), ILECO III successfully conducted the Symbolic Energization of Tagubanhan Island. According to Atty. James G. Balsomo II, General Manager of ILECO III, the organization believes that access to power is Read more
This activity is in preparation for the energization of said off-grid area on June 6, 2024. The IEC also aims to empower the member-consumer-owners (MCOs) through dissemination of important information pertaining to ILECO III’s operation. The energization of far-flung areas especially those in off-grid is part of ILECO III’s fulfillment of its mandate of total Read more
BIDS AND NOTICES
Design and Integration of ILECO III Mobile Application Read more