• UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 8, 2022)

    Date: September 8, 2022 Time of interruption: 6:56 AM Time of Restoration: 9:15 AM Affected Area: Tabugon Proper and Tabugon Minor, Carles (Island) Activity: Inspection of line and replaced busted fuselink and change defective kWhr Meter We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 7, 2022)

    Date: September 7, 2022 Time of interruption: 7:05 PM Time of Restoration: 7:35 PM Affected Area: Sitio Cawayan Sulod, Cawayan, Carles Activity: Inspection of line and replaced busted fuselink We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 7, 2022)

    Date: September 7, 2022 Time of interruption: 5:54 PM Time of Restoration: 6:46 PM Affected Area: Tupas St., Poblacion, Barotac Viejo Activity: Repair secondary inner jumper cut-off We apologize for the inconvenience. For your information. Read more

  • ANTI-PILFERAGE ACT (RA 7832)

    ‘An act penalizing the pilferage of electricity and theft of power transmission lines/materials, rationalizing system losses by phasing out pilferage losses as a component thereof, and for other purposes.’ Ang layi wala nagapahanugot sang masunod: FLYING CONNECTION – Pag-angot sang linya sang kuryente sa iban nga balay nga may metro ukon kuntador. TAMPERING – Pagkuti/pagbutang… Read more

  • Ka MCO! Yari ang Tips sa pag-boto this 2025 MIDTERM ELECTION.

    Read more

  • PRESS RELEASE

    Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig. Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III: •… Read more

  • PUBLIC ADVISORY HOLIDAY NOTICE

    2025 MIDTERM ELECTION – MAY 12, 2025 (MONDAY) MAIN OFFICE AND AREA OFFICES – CLOSED ASSIGNED MAINTENANCE CREW ARE AVAILABLE AT AREA OFFICES TO ADDRESS YOUR CONCERNS/ COMPLAINTS. REGULAR OFFICE HOUR WILL RESUME ON MAY 13, 2025 (TUESDAY) MADAMO GID NGA SALAMAT SA INYO PAGHANGUP. Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more