• SCHEDULED POWER INTERRUPTION SA HUNYO 20-24, 27-30 KAG HULYO 1, 2022 SA BANWA SANG LEMERY

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III magaumpisa ini alas 9:00 AM- 4:00 PM (7 ka oras ang kalawigon) para sa pag-clearing sang linya. Ang petsa kag lugar nga apektado sang sini nga power interruption amo ang masunod: PETSA APEKTADO NGA BARANGAY Hunyo 20, 2022 Capiñahan, LemeryHunyo 21, 2022 Cabantohan,… Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 15, 2022)

    Date: June 15, 2022 Time of interruption: 11:30 AM Time of restoration: 12:40 PM Affected areas: Batuan and Amayong, San Dionisio, Iloilo Activity: Replacement of busted transformer We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 15, 2022)

    Date: June 15, 2022 Time of interruption: 9:00 AM Time of restoration: 9:50 AM Affected area: Pili, Ajuy, Iloilo Activity: Replacement of busted transformer We apologize for the inconvenience. For your information. Read more

  • ANTI-PILFERAGE ACT (RA 7832)

    ‘An act penalizing the pilferage of electricity and theft of power transmission lines/materials, rationalizing system losses by phasing out pilferage losses as a component thereof, and for other purposes.’ Ang layi wala nagapahanugot sang masunod: FLYING CONNECTION – Pag-angot sang linya sang kuryente sa iban nga balay nga may metro ukon kuntador. TAMPERING – Pagkuti/pagbutang… Read more

  • Ka MCO! Yari ang Tips sa pag-boto this 2025 MIDTERM ELECTION.

    Read more

  • PRESS RELEASE

    Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig. Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III: •… Read more

  • PUBLIC ADVISORY HOLIDAY NOTICE

    2025 MIDTERM ELECTION – MAY 12, 2025 (MONDAY) MAIN OFFICE AND AREA OFFICES – CLOSED ASSIGNED MAINTENANCE CREW ARE AVAILABLE AT AREA OFFICES TO ADDRESS YOUR CONCERNS/ COMPLAINTS. REGULAR OFFICE HOUR WILL RESUME ON MAY 13, 2025 (TUESDAY) MADAMO GID NGA SALAMAT SA INYO PAGHANGUP. Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more