
POWER RATES
POWER ADVISORIES
Date: November 11, 2023 (Saturday) Time of interruption: 6:23 p.m. Estimated time of restoration: 11:00 p.m. Affected area/s: Municipalities of Balasan and Carles, and portion of Estancia Cause of power interruption: Line fault in primary distribution line Our maintenance team is currently troubleshooting the damaged primary distribution line for the power to be restored. We Read more
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa NOBYEMBRE 15, 2023 (MIYERKULES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag relocate sang Single-Phase Line sa Brgy. Pasayan, Batad. Ang lugar nga apektado sang sini nga power interruption amo ang Brgy. Pasayan, Batad. Madamo gid nga salamat Read more
Date: November 9, 2023 (Thursday) Time of interruption: 7:12 PM Estimated time of restoration: 7:35 PM Affected area/s: Sitio Waling-Waling, Poblacion and Brgy. Barosbos, Carles Activity: Inspection and replaced busted fuse link of Phase C Line. We apologize for the inconvenience. For your information. Read more
NEWS AND UPDATES
‘An act penalizing the pilferage of electricity and theft of power transmission lines/materials, rationalizing system losses by phasing out pilferage losses as a component thereof, and for other purposes.’ Ang layi wala nagapahanugot sang masunod: FLYING CONNECTION – Pag-angot sang linya sang kuryente sa iban nga balay nga may metro ukon kuntador. TAMPERING – Pagkuti/pagbutang Read more
Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig. Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III: • Read more
BIDS AND NOTICES
Design and Integration of ILECO III Mobile Application Read more