
POWER RATES
POWER ADVISORIES
Power were restored in ANILAO, BANATE AND PORTION OF BAROTAC VIEJO. Power restoration to affected areas is not yet determined. ILECO III Technical Team is still closely coordinating with National Grid Corporation of the Philippines (NGCP) and power suppliers for total power restoration of franchise coverage. We apologize for the inconvenience. For your information. Read more
Pahibalo sa mga katapo-konsumidores nga ang POWER INTERRUPTION sang ILECO III sa ABRIL 29, 2023 (SABADO),8:00 AM-5:00 PM para sa patigayunon nga clearing sang linya (backbone kag lateral lines), pag-relocate sang Single Phase Line kag replacement sang gabok nga mga poste ang KANSELADO. Ang lugar nga apektado sang sini nga CANCELLED power interruption amo ang Read more
Estimated Time of power restoration: NOT YET DETERMINED ILECO III Technical Team is still closely coordinating with National Grid Corporation of the Philippines (NGCP) and power suppliers for total power restoration of franchise coverage. We apologize for the inconvenience. For your information. Read more
NEWS AND UPDATES
On September 12, 2024, ILOILO III and More Power came together for an exciting Goodwill Basketball Game and Fellowship Night, fostering a spirit of sportsmanship and camaraderie. The event was graced by the presence of our esteemed General Manager, Atty. James G. Balsomo II, alongside the dedicated Board of Directors, Management, and Staff of ILECO Read more
Disclaimer: All music used is owned by its rightful owner; no copyright infringement is intended. https://www.facebook.com/ILECO3/videos/2242545816107570 Read more
Ka-MCO! Looking for ways to save energy and money at home? Take a look at these Energy Conservation Tips we have put together, they could help you in reducing your monthly bills. Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more