This inspection is conducted to check the accuracy and standard installation of equipment in the Metering Facility in the said substation.

It was participated by key personnel from ERC and NGCP. ILECO III headed by our General Manager Atty. James G. Balsomo II and TSD Manager Engr. Raim A. Villarias warmly welcomed our visitors.