RECONNECTION OF PULL OUT KWHR METER AND REPLACED METER BASE LOOSE CONNECTION IN BATAD
—
by
ILECO III
ILECO III Technical personnel conducted reconnection of pulled out kWhr Meter and replaced meter base loose connection at Brgy. Hall, Caw-I, Batad today, October 15, 2022 (Saturday).