Update on the ongoing unscheduled power interruption in Natividad Area Coverage as of 8:00 p.m.
—
by
ILECO III
Ongoing repair of the 69kv Disconnect Switch of Natividad Substation is being conducted by our Technical Team. Time of power restoration is not yet determined.